Day 76

Image
Day/Date: Wed, 31/1, 9am-5.10pm Venue: StickerPro My office Activities:  Today (Day 76) I downloaded the artworks from customer. I put a red colour square which is cutline at the back and added stroke so that when the cutting machine cut slightly outside, it won't affect too much the artworks. I arranged them in an A3 size and then printed out and cut out the decals.

Day 75

Image
Day/Date: Tue, 30/1, 9am-5.35pm Venue: StickerPro My office Activities:  Today (Day 75) I received artworks from customer. I arranged the artworks on an A3 size and put signs that needed to be cut. I print them all out using art card and manually use cutter to cut. I arranged and put them properly. After that, I watch the sign and cut using the cutter. Then, the decals were ready as shown on the pictures.

Day 74

Image
Day/Date: Mon, 29/1, 9am-6.25pm Venue: StickerPro My office Activities:  Today (Day 74) I designed balloon for happy birthday. After customer confirmation, I cut it out. I use condensed font to type out the wordings needed as they were small. The printed out wordings will be more clearer.

Day 73

Image
Day/Date: Fri, 26/1, 9am-5.40pm Venue: StickerPro My office and CUE office  Activities:  Today (Day 73) I cut out frosted stickers based on the size needed. I also cut out the wording with different colours. After that, I joined them up with markings. Then I went installation with my colleagues and also my boss to install the stickers. The frosted stickers were stuck inside glass and the wordings were outside the glass.

Day 72

Image
Day/Date: Thurs, 25/1, 9am-5.10pm Venue: StickerPro My office Activities:  Today (Day 72) I designed foamboard for displaying Happy Chinese New Year at home and also office. I created the foamboard according to the size needed for customers. I downloaded vectors image from website and put them in the artworks. Then I modified based on customer's requirements.

Day 71

Image
Day/Date: Wed, 24/1, 9am-5.05pm Venue: StickerPro My office Activities:  Today (Day 71) I cut out decals for Happy Chinese New Year.  I arranged the artwork in a A3 size and add stroke to the artworks so that the cutting machine won't cut the artworks. The customer needed them in gold colour so I cut out the gold colour stickers in A3 size so that the stickers fit the printer printing size. After that, I used printer to print out the artworks.

Day 70

Image
Day/Date: Tue, 23/1, 9am-5.05pm Venue: StickerPro My office Activities:  Today (Day 70) I adjusted the size of customer's artwork in canva so that it can be printed out to fix the position on where they can be stuck as customer requested. After that, the customer's designer adjusted the artworks. We downloaded the artworks and send print.

Day 69

Image
Day/Date: Mon, 22/1, 9am-6.55pm Venue: StickerPro My office Activities:  Today (Day 69) I designed balloon for people who own a new car. After that, I downloaded customer's artwork from canva and printed out and cut out the decals. 

Day 68

Image
Day/Date: Fri, 19/1, 9am-5.50pm Venue: StickerPro My office Activities:  Today (Day 68) I printed and cut out decals using printer and cutting machine. I found out the Fit Move stickers that stuck on the wall is not stackable from customer's feedback because of the paint of the wall so I cut out the decals again for my boss to do reinstallation.

Day 67

Image
Day/Date: Thurs, 18/1, 9am-5.50pm Venue: StickerPro My office and Fit Move Studio  Activities:  Today (Day 67) I cut out decals and teared out the unusable part. It had many tiny stickers so we teared out the stickers carefully. The cut out decals were reflected because they needed to be stuck on the windows. After that, we make sure the stickers stuck on the transfer tape so that it is easier for installation. Me and my colleagues went installation with my boss. We installed the stickers cooperatively on the windows and also a wall.

Day 66

Image
Day/Date: Wed, 17/1, 9am-5.15pm Venue: StickerPro My office Activities:  Today (Day 66) I learned how to rounded corners so that the wording will be smooth. After that, I arranged the artworks at an A3 size art board. Then, I printed out and cut out the decals. When the quantity was corrected, I informed the customer to come and collect.

Day 65

Image
Day/Date: Tue, 16/1, 9am-5.05pm Venue: StickerPro My office Activities:  Today (Day 65) I trace the image from online and I put a rounded circle on the back. After that, I arranged them in an A3 paper. Then, I add stroke to the decals so that when the cutting machine not that accurate, it won't affect too much. Before cut, I laminated the stickers with matte lamination. 

Day 64

Image
Day/Date: Mon, 15/1, 9am-5.20pm Venue: StickerPro My office Activities:  Today (Day 64) I cut out decals for bakery opening hours and some details. I knew that we don't have white ink for transparent stickers, only CMYK. I also use clipping mask to put the artworks prepared from customer on the size that has been measured to stick on the glass window. All the stickers will be in one-way-vision.

Day 63 (OT)

Image
Day/Date: Sat, 13/1, 10am-6pm Venue: Respond.io (Permata Sapura Tower)  Activities:  Today (Day 63) me and my colleagues went installation with my boss. We first opened out the stickers that were from customers. After measured the doors' actual size, we found that the stickers were more bigger than the doors. Thefore to make easier the installation, we cut out the unusable part before we stuck the stickers on the door. After that, we cleaned up the doors and started installed the stickers on 21 doors. It is quite difficult to install as the stickers is tinted so needed to be careful and squeeze as harder as you can so that there was no bubble inside.

Day 62

Image
Day/Date: Fri, 12/1, 9am-5.20pm Venue: StickerPro My office Activities:  Today (Day 62) me and my colleagues printed out and cut out decals that needed 21 pieces for different types of cny cookies. The file has been created before so we found the needed type and printed out. We also cut by using the type it self. I also arranged the labels that will be stuck on wine glass. Then, I  continue to printed out and cut out the A3 transparent paper.

Day 61

Image
Day/Date: Thurs, 11/1, 9am-5.10pm Venue: StickerPro My office Activities:  Today (Day 61) I designed design for two foamboard. For the cat foamboard, I ammend many times as at the first, the customer said wrongly that she need cat design for a foamboard but actually the customer need cat foamboard. After that, I designed the foamboard based on the given draft and sample. And also at last, the customer needed to do a cat ears to be stuck on the foamboard.

Day 60

Image
Day/Date: Wed, 10/1, 9am-5.35pm Venue: StickerPro My office Activities:  Today (Day 60) I designed balloon for happy 1st birthday. After that, I printed out PVC stickers. Then, I gloss lamination the stickers. Moreover, I cut out the stickers using cutting machine. Last, I packed them up to be ready for delivery to customers. I learned how to use GDEX.

Day 59

Image
Day/Date: Tue, 9/1, 9am-5.15pm Venue: StickerPro My office Activities:  Today (Day 59) I designed balloon for happy birthday mum. Besides that, I also printed out and cut out transparent stickers. After the card received, we found that there is a hole on the card. Thefore, I measured the size and added a hole to be cut. Then, me and my colleagues started to stick the stickers on both sides of the card.

Day 58

Image
Day/Date: Mon, 8/1, 9am-5.45pm Venue: StickerPro My office and people house  Activities:  Today (Day 58) I went installation with my boss. I learned that one way vision is that people can't see from the outside but can see from the inside. It is made from small circles. However, when the inside is lighter, then people can see from the outside. Therefore, the customer also needed us to placed half frosted stickers of the window's size to make sure people can't see from the outside.

Day 57

Image
Day/Date: Fri, 5/1, 9am-5.25pm Venue: StickerPro My office and Fit Move studio Activities:  Today (Day 57) me and my colleagues printed out and cut out decals that needed 10 pcs of A3. We also cut out the decals that needed to be stuck on the windows and also the wall separately as they were big. We also make sure that the stickers stuck on the transfer tape so that it's easy to tear off. Then, we go installation. I learned that the stickers will not be sticky when it stuck on the wall because of the paint.

Day 56

Image
Day/Date: Thurs, 4/1, 9am-5.10pm Venue: StickerPro My office Activities:  Today (Day 56) I helped to place the decals on the measured door in AI. The frosted part of the stickers will be stuck inside the door while the wording will be stuck at the outside of the door. The wording will be cut in different colours and combined using marking. It also has marking to be align with the frosted stickers. I also print out decals that needed to stick on different places.

Day 55

Image
Day/Date: Wed, 3/1, 9am-6.30pm Venue: StickerPro My office Activities:  Today (Day 55) I print out and cut out decals. It is difficult to tear out the stickers as the stickers is in unique shape. I learned how to change the knife of the cutting machine when it is not sharp enough. I also helped to replace the wrong decals with the new one.

Day 54

Image
Day/Date: Tue, 2/1, 9am-6.05pm Venue: StickerPro My office Activities:  Today (Day 54) I cut out two types of decals for a customer. First, I put marking on the place that is easy to recognise so that it can be separated with different colours. Then, I seperated the parts with different colours and cut out them with their respective colours.