Day 11 (OT)


Day/Date: Sat, 28/10, 8am-7pm

Venue: Setia Alam Lotus carpark

Activities: 

Today (Day 11) I helped my boss install stickers on a lorry with my colleague. Ten stickers were needed to be stuck on the lorry. One sticker took almost an hour. First, my colleague and I went to the Lotus and bought the things needed. Then we cleaned up the lorry and painted the gap using 3M primer so that the sticker would be sticky and last longer after it was stuck on the lorry. After that, we helped to prepare the stickers that needed to be stuck so that our boss could stick them on the lorry. Moreover, we also helped to hand over the tools needed by the boss and helped to hold and move the ladder. In addition, we helped to trim the unnecessary parts using a cutter and make the uneven parts even using a lighter and a piece of pushing equipment. The stickers could be unstuck using water and detergent, making the installation easier to push off as the lorry was not flat. Lastly, we cleaned up the place and informed the lorry driver to come to take his lorry.

Comments

Post a Comment

Popular posts from this blog

Day 95